Home | What we do | How we do it | Contact Us | Links
 
Case History
 
Back to Case Studies
     
 

Savill Court

Date: 2005

Location: Egham, Middlesex

Project: Hotel Fitness and Leisure Spa

Sector: Hotels / Leisure

End Client: Luxury Private Hotel

Project Team Principles: Cititec Building Services

Value: >£40k

System: Trend IQ2 / IQL
Control I/O: 60+
Control Panels: 1x MCC(s)
Terminal Units: 8x FCU(s)

Plant / Services:
General Supply / Extract AHU’s (c/w Recuperator Units)
Swimming Pool Filtration / Temperature Control
Gas Fired Heating Plant
FCU Terminal Units
Heat Recovery Packaged AHU’s

Notable / Special Features:
Design and Build Type Project
Swimming Pool / Gymnasium / Health Suite and Recreation Rooms

Project Overview:

This luxury hotels health and fitness centre was provided to the end client by a multi-disciplinary project team, working to a general design, and build, type project brief.

Orlanix developed, designed, installed, and commissioned, the Building Management System for the centre, and associated bar area; based on the requirements of the project performance specification, ongoing design changes, system additions, and enhancements.

The primary function of the BMS is to provide conditioned air for the leisure centre, associated health suite, and bar area.

The BMS is monitored via the hotel maintenance and facilities dept via the MCC’s  fascia mounted IQVIEW display screen; with the addition of a remote general alarm panel located within the hotels reception area.

 
orlanix