Case History
 
Back to Case Studies
     
 

Park Inn Hotel

Date: 2007

Location: Heathrow

Project: Conference Centre

Sector: Hotels/Leisure

End Client: Large Hotel Group

Project Team Principles:
Cudd Bentley / Skanska / MJ Lonsdale

Value: >£100k

System: Trend IQ2/963
Control I/O: 150+
Control Panels: 2x MCC(s), 2x Field Panel(s)
Terminal Units: 54x VAV Unit(s)

Plant / Services:
General Supply / Extract AHU’s
Heat Recovery Run Around Coils
Gas Fired AHU Heating / DX Cooling
Air Cooled Chillers
Packaged Heating Plant
VAV Terminal Units

Notable / Special Features:
Design and Build Type Project
Large Fresh Air Plant
Terminal Units Installed At Extra High Level / Multi Stacked
Demand Controlled Ventilation

Project Overview:

The conference centre was provided to the end client by a multi-disciplinary project team, working to a general design brief.

Orlanix developed, designed, installed, and commissioned, the Building Management System for the conference centre, and associated roof plant areas; based on the requirements of the project performance specification, ongoing design changes, system additions, and enhancements.

The primary function of the BMS is to provide conditioned air for 2 large conference rooms, associated satellite meeting rooms, and a restaurant / nightclub area.

The BMS is monitored via the hotel maintenance and facilities dept on a pc running a Trend 963 graphics package; connected to the MCC’s, and field plant controllers, via an in-house CAT5 type IT link.

 